Following the overhaul of a diesel locomotive at BREL Doncaster Works and after static testing on a load bank, a test run with a suitable load would be arranged. Typically the test train would run between Doncaster and Tyne Yard at high speeds to make sure that the engine and all other control equipment operated correctly, only once a successful test run was completed would the locomotive be released back in to traffic with British Rail.